Please use this page to post your comment(s).If you are not logged in, please sign in or join to comment.
View this article on www.facilitiesnet.com
The topic of UPS maintenance interests me very much. It is what I do (Remote Monitoring Systems) for a living.
And I agree with you, there are more and more UPSs being turned up every week. And the only real way to keep them running at peak performance is through a reliable PM schedule.
My experience has been it can take as much as a full 30 seconds for a generator to stablize and transfer the load.